Broward County · City guide
Permit Expediting in Fort Lauderdale
Fort Lauderdale will not issue to a contractor whose credentials have lapsed in LauderBuild, and its Building Safety Inspection Program catches most commercial and multifamily buildings at 25 years, not 40.
Permitting in Fort Lauderdale: what actually governs your file
Fort Lauderdale reviews its own work. A package assembled to Broward County conventions will not necessarily clear here, and these are the differences that matter most.
Local registration through LauderBuild is required
Contractors must register with the city through LauderBuild in addition to state licensure or a Broward County Certificate of Competency. Required uploads include a city-specific contractor registration form, the state licence or county certificate, proof of liability insurance naming the city, and a workers' compensation certificate or exemption letter. Permits will not issue against expired credentials.
HVHZ, with engineering required on accessory structures
Broward is an HVHZ county under Florida Building Code Chapter 16, with design wind speeds of roughly 156–180 mph by risk category. Sheds and other accessory structures in the HVHZ need signed and sealed engineering or state or Miami-Dade product approval rather than standard prescriptive details.
The Building Safety Inspection Program starts at 25 years
Fort Lauderdale administers a Broward County Board of Rules and Appeals inspection programme applying to most commercial and multifamily buildings 25 years or older, with re-inspection every 10 years and a 180-day submission window from notice. Federal and state buildings, Broward Schools, residential of four units or fewer and three storeys or fewer, fee-simple townhouses and structures under 3,500 square feet are exempt. Submissions go through LauderBuild from a licensed engineer or architect.
Elevation certificates on all new construction and substantial improvements
The city requires elevation certificates prepared by licensed surveyors, architects or engineers for all new construction and substantial improvements, submitted to the city's Floodplain Manager as part of the permit process.
Historic Preservation Board review runs ahead of permitting
Development affecting designated historic resources goes through the city's Historic Preservation Board and requires a Certificate of Appropriateness, coordinated through Urban Design & Planning before Building permitting.
Filing with City of Fort Lauderdale Development Services Department, Permitting Services
Submittals go through LauderBuild, an Accela Citizen Access system.
Contractor registration in Fort Lauderdale
LauderBuild registration is mandatory on top of the state licence or Broward Certificate of Competency, and lapsed insurance or workers' compensation documentation will stop a permit from issuing even mid-project.
City or county? Check the parcel first
Fort Lauderdale abuts Wilton Manors, Oakland Park, Lauderdale-by-the-Sea, Dania Beach and Plantation, and all of them permit separately. On a boundary parcel the mailing address is not the answer.
The parcel record settles this, not the envelope. We check it against the municipal boundary map at the start of every file, and you can do the same with our free building department lookup before you call anyone.
Where in Fort Lauderdale we file
We file across the city — Downtown and Flagler Village, Las Olas and the Isles, Victoria Park, Rio Vista, Coral Ridge, Harbor Beach and the Sistrunk corridor.
Whatever the jurisdiction, the work itself is the same set of services: see the full list of permitting services, or start with permit facilitation and filing if the permit simply needs to get filed and driven to issuance.
City requirements in Fort Lauderdale move on their own schedule, separately from Broward County. This reflects published guidance and our filing experience as of this writing; the authority having jurisdiction is the only source that is current by definition. If you want the position on a specific question today, call us.
Permitting in Fort Lauderdale — common questions
Do I have to register with Fort Lauderdale to pull a permit?
Yes, through LauderBuild, in addition to your state licence or Broward County Certificate of Competency. The city requires its own registration form, proof of liability insurance naming the city, and workers' compensation documentation. Permits will not issue against expired credentials.
When is my Fort Lauderdale building due for safety inspection?
The Building Safety Inspection Program applies to most commercial and multifamily buildings at 25 years or older, then every 10 years, with a 180-day window from notice. Residential of four units or fewer and three storeys or fewer, fee-simple townhouses, and structures under 3,500 square feet are among the exemptions.
Does a shed need engineering in Fort Lauderdale?
In the HVHZ, generally yes. Sheds and other accessory structures need signed and sealed engineering or state or Miami-Dade product approval rather than standard prescriptive details.
Do I need an elevation certificate?
For all new construction and substantial improvements, yes — prepared by a licensed surveyor, architect or engineer and submitted to the city's Floodplain Manager as part of the permit process.
What we file most in Fort Lauderdale
40-Year Recertification & Milestone
A recertification notice arrives with a deadline attached, and missing it escalates fast — unsafe structure notices, fines, and in the worst cases an …
Learn morePermit Facilitation & Filing
You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, we track it, and we push i…
Learn moreMunicipality Registration
Your DBPR license lets you contract in Florida. It does not, by itself, let you pull a permit in most Florida municipalities. That takes a separate lo…
Learn morePlan Review Coordination
A permit in plan review is not one queue. On a commercial project it can be six queues, each with its own reviewer, its own comments and its own idea …
Learn moreGet a free quote for Fort Lauderdale
Tell us the address and what is happening. We will tell you which jurisdiction controls it and what it takes.
Ready to get your permit moving?
One call tells you which jurisdiction controls your project, what it will take, and what it will cost. Most of the time we can scope it on the phone.